Construction Progress

This is outside the bathtub to the left.  The sink will go here on the wall facing.  

Henry was able to use the last of the wall panel board in this area.  Most of the piecing will be covered by the sink unit so it will look fine.

The new bathtub with rolled up cover on the floor.   Ready for the first customer.  

Last week this wall was put up in the bedroom area.  Taping and mudding to do from here.