Moving day in Hatacho and Ono


This is what our empty master bedroom looked like.  Had to take the drawers out of the big dresser
This room is near our new home in Ono.  It will be Henry's office with a piano to practice on.

  The rental trkuck is up the street unloading stuff into Henry's room.  

 Loading the truck in Hatacho -this one and the next.   



The master bedroom almost done.  On the other side of the big furniture is my sewing area.  







 

Moving Date coming up

 March 5 we will move into the house in Ono-shi.  Packing and sorting all the stuff  in our current home is a b i g  job.  😓

Here are some current photos of the basically finished rooms.


  We took out the tatami mat floor in the living room area and inserted what was left of the insulation in the floor.  


  Henry put this beautiful dark plywood on the subfloor.   It could have been the main floor, but noone will see it  :-)  On top of this will be the main floor boards.  Photo coming.  



  The bathroom area with sink installed and carpets on the floor.  

  These new lights are in the bedroom downstairs.  It's an odd-shapped room with two windows and sliding glass doors opening to the street.  


  This is opposite the sliding doors where the bed will go.  The window area is at one end of the house where I will have my sewing space.  

  The toilet room door under the stairs.  To the left is the new sink.    More photos forthcoming.