Pastor Saeki came and helped to knock out the ofuro (bathtub) area so a new system bath can be installed. It had cinder block, concrete, rock; generally a big, heavy mess.
Dan Gardner came up for a week and helped alot. He suggested changing the stairs to the second floor room which made them straight up and wider with a gentler slope.
Mr. Fukumoto painted the kitchen with a first coat of white. That corner had water stains in the ceiling.
No comments:
Post a Comment