Work on the new bridge about 3 km from here continues. Here are some recent photos of putting the steel structures in place. It is supposed to be done next summer and the other bridge will be taken down sometime. It has been interesting to watch the work over the last 1 1/2 years.
Approaching the bridge from the Ono side, we cross on the left side of the crane. The crane lifts the steel structures and puts them in place.
The steel structure is in front of that traffic cone. The white cement on the right is where the bridge will end.
This is from the Kato side across the river.
These steel bars are for workers to get in place . Here two of them are holding the crane that has the steel structure to anchor it in place.
More later as things progress.