Henry has started a much-needed project of cleaning/painting the outside of the building. The preliminary step is to make scaffolding. Josh Durden came over to help put it together.
|
The truck delivering the 2x4-cut lumber (not common here in Japan). |
|
Getting the frame laid out. |
|
The basic set-up being set up. This will go the length of the building about 52 feet, then it has to be dismantled to do the other side and the front and back. First the building gets power-washed, then it will be painted, so there's going to be lots of putting this up and taking it down in the weeks to come. Please pray for safety. |
No comments:
Post a Comment